In order to enable us to provide you with an accurate and realistic offer, at least the following data need to be include in the request for proposal:
Pusher (Tug) data:
- Length over all
- Breadth
- Draught
- Displacement
- Bow shape
- Power
- Propulsion system
- General Arrangement Plan (at least of the
fore ship area)
- Lines Plan (at least of the bow fore ship area)
Barge Data:
- Length over all
- Breadth
- Draught
- Displacement
- Required draught range (min. ballast
draught; max. loaded draught)
- General Arrangement Plan (at least aft
area)
- Lines Plan (at least aft area)
Common Data:
- Classification Society and class notation
- Flag authority
- Operating sea area
- Operating sea state
- Required delivery time and delivery address (shipyard)